Who unpacks and installs the tub & chiller?Updated an hour ago
If you purchased assembly/white-glove, installers will unpack, position and, if selected, connect plumbing/electrical. If not, the carrier will leave the crate curbside and you or your contractor must unpack and install. If chiller is packed inside the crate, the crate must be opened on site.